The project consists of the following
Construction of a new 1300 sq foot sports hall, multiple muga pitches, a new car park, demolishing of the existing sports hall and new sports fields constructed on the footprint of the old sports hall.
Our Brief involves:
- Site clearance in preparation for the piling rig.
- 6000 m3 reduce level dig.
- Foundations with bolt settings.
- Preparation and pouring of a 1300 sqm concrete structural slab.
- Internal and external Foul and storm drainage.
- Installation of 269 m3 attenuation tank.
- Installation of a full retention by pass separator.
- All external services including installation of street furniture.
- Construction of all car parks and adjoining roads including all blacktop.
- Construction of the Muga pitches.
- All kerbing and 1300 sqm of block paving.