The Project – The civil works consist of the following: removal of concrete slabs, pads and ground beams, installation of drainage below ground – 150 mm dia. to 370 mm dia., liner channel drainage, manholes, full retention interceptor traps and attenuation tanks; installation of all external services and pits; earthworks – hazardous and non-hazardous muck off-site 26,400 mᶾ – screening and recycling topsoil.; construction of amphitheatre; construction of roads 1,000m² – construction of permeable carparks 400 m² – construction of MUGA 1,100 m² – construction of block paving 200 m²; landscaping – construction of cricket and football pitches; import all topsoil, cultivate and plant to all areas; installation of street furniture and signage.