The Project – The civil works consist of the following: demolition works of existing building; removal of concrete slabs, pads and ground beams, installation of drainage below ground – 150 mm dia. To 600 mm dia., liner channel drainage, manholes, full retention interceptor traps and attenuation tanks; installation of all external services and pits; earthworks – cut and fill on site – hazardous and non-hazardous muck off- site 10,000 mᶾ. – recycling and screening topsoil; construction of foundations; construction of roads 3,100m² – construction of permeable carparks 700 m² – construction of block paving 1,500 m²; landscaping – construction of football pitches; import all topsoil, cultivate and plant to all areas; installation of street furniture and signage