The project consisted of the refurbishment of the existing theatre, our brief involved all Temporary works installation, engineering and setting out, reduce dig inside the theatre, mass foundations, all concrete works including the R.C Concrete floor slab and mezzanine Deck R C Slab , internal drainage and services infrastructure and all external finishing works.